1 | PIGGING OF 18” X 90KM GAS PIPELINE TO OBAJANA METERING STATION | Pigging of 18” × 90 km Gas Pipeline to Obajana Metering Station and Replacement of Passing Valves on the Kicker Line. | NGML | 2025 |
2 | PIGGING OF 16” X 29KM GAS PIPELINE TO OKPELLA METERING STATION | Pigging of 18” × 90 km Gas Pipeline to Obajana Metering Station and Replacement of Passing Valves on the Kicker Line. | NGML | 2025 |
3 | INSTALLATION OF 2 NOS OF 18’’ × 600# VALVES AND MODIFICATION OF IGRF PIG RECEIVER’S SYSTEM | Decommissioning and Installation of 2 Nos of 18” × 600# Valves, Modification of IGRF Pig Receiver System, Testing and Commissioning at ACCUGAS IGRF in Akwa-Ibom. | ACCUGAS | 2025 |
4 | DED FOR GAS SUPPLY TO MANGAL CEMENT PIPELINE SYSTEM | Detailed Engineering Design (DED) of Pipeline System for Gas Supply to Mangal Cement in Mopa, Kogi State. | Mangal Industries Ltd. | 2025 |
5 | THE QUARRY WATER SUPPLY PROJECT TO MANGAL INDUSTRIES LIMITED’S (MIL) PLANT | EPCIC of 8″ × 3 km Water Pipeline and Water Treatment Facility to Mangal Cement Plant. | Mangal Industries Ltd. | 2024 – 2025 |
6 | FEED FOR GAS SUPPLY TO MANGAL CEMENT PIPELINE SYSTEM | Front End Engineering Design (FEED) of Pipeline System for Gas Supply to Mangal Cement in Mopa, Kogi State. | Mangal Industries Ltd. | 2024 – 2025 |
7 | SUPPLY OF GAS REGULATOR REFLUX 819 | Procurement and Delivery of Gas Regulator Reflux 819. | NGML | 2024 |
8 | PROVISION AND INSTALLATION OF NINE (9 NOS) SPIRIT-IT FLOW-X PIETRO FIORENTINI (PF) FLOWEB FLOW COMPUTERS AT OKPELLA METERING STATION AND BUA CEMENT PLANT | Procurement, Delivery and Installation of Nine Spirit-It Flow-X Pietro Fiorentini Floweb Flow Computers at Okpella Metering Station and BUA Cement Plant. | NGML | 2024 |
9 | PROVISION AND INSTALLATION OF FOUR (4 NOS) SPIRIT-IT FLOW-X PIETRO FIORENTINI (PF) FLOWEB FLOW COMPUTERS AT IBESE METERING STATION | Procurement, Delivery and Installation of Four Spirit-It Flow-X Pietro Fiorentini Floweb Flow Computers at Ibese Metering Station. | NGML | 2024 |
10 | EPCIC OF FACILITY PIPING AT GREENVILLE, MAIDUGURI | The Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of Facility Piping at Greenville LNG Facility, Maiduguri. | Greenville LNG | 2024 – 2025 |
11 | EPCIC OF FACILITY PIPING AT GREENVILLE, ENUGU | The Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of Facility Piping at Greenville LNG Facility, Enugu. | Greenville LNG | 2024 – 2025 |
12 | CONSTRUCTION, TESTING, AND COMMISSIONING OF 18” × 10 KM UNDERGROUND STEEL PIPELINE & ASSOCIATED WORKS AT SHAPADE–ONILE OKO VILLAGE ALONG LAGOS–IBADAN EXPRESSWAY | Construction, Installation, Testing, and Commissioning of 18” × 10 km underground Steel Pipeline and associated works at Shapade to Onile Oko Village, along Lagos-Ibadan Expressway in Ogun State. | NIPCO Gas Limited | 2024 – Date |
13 | CONSTRUCTION, TESTING, AND COMMISSIONING OF 12” × 8 KM UNDERGROUND STEEL PIPELINE & ASSOCIATED WORKS AT LEKKI, LAGOS STATE | Construction, Installation, Testing, and Commissioning of 12” × 8 km underground Steel Pipeline and associated works at Lekki in Lagos State. | NIPCO Gas Limited | 2024 – Date |
14 | MATERIAL SUPPLY, FABRICATION & INSTALLATION FOR NEW DISPENSER/PRIORITY PANEL & CASCADES CONNECTION | Procurement, Construction, Installation and Commissioning of Piping Network for New Dispenser/Priority Panel and Cascades. | Seven-Up Bottling Company | 2024 – 2025 |
15 | MATERIALS SUPPLY & FABRICATION FOR CNG DISPENSER INSTALLATION | Procurement, Construction, Installation and Commissioning of Piping Network for CNG Dispenser Installation. | Seven-Up Bottling Company | 2024 |
16 | NIGERIA COMPRESSED AIR UPGRADE PHASE 1 | Engineering, procurement, and construction of piping network for the compressor house upgrade within Ardagh Glass Packing Plant including fabrication of pipes and structural supports. | Ardagh Glass Packaging | 2023 |
17 | EPCIC OF 60 MMSCFD PRMS FOR GAS SUPPLY TO BUA CEMENT PHASE 2 | Engineering, Procurement and Construction of the entire PRMS Station and 29 km Pipeline—including tie-in from Oben-Ajaokuta. Detailed design, stringing, welding, painting, testing, hot-tapping, etc. | BUA Cement Plc | 2023 – 2024 |
18 | EPCIC OF FACILITY PIPING FOR BUA LINE 3 KILN & CALCINER AND TURBINE | Engineering, procurement & construction of piping network to Kiln, Calciner & Turbine at BUA Cement Plant including fabrication of pipes & supports. | BUA Cement Plc | 2023 – 2024 |
19 | LINE 5 PROJECT: GAS SUPPLY TO LINE 5 KILN, CALCINER & 70 MW POWER PLANT | Design & installation of a 12″ tap from existing 14″ pipeline, buffer tank feed, and 10″ gas train for a proposed 70 MW plant beside an existing 50 MW unit. | BUA Cement Plc | 2023 – 2024 |
20 | EPCIC OF FACILITY PIPING FOR A.A. RANO NIGERIA LTD. LOBP PLANT | Facility Piping for Process Area, Tank Farm, Utilities; Civil works for supports foundations; Steel works for shelters, racks, trays & supports—to produce 20,000 m³ lubricants & 2,000 tons greases/year. | A.A. Rano Nigeria Limited | 2023 – 2024 |
21 | EPCIC OF CIVIL/STRUCTURES FOR A.A. RANO NIGERIA LTD. LOBP PLANT | Civil works for equipment & pipe support foundations; Steel works for shelters, pipe racks, cable trays & supports. | A.A. Rano Nigeria Limited | 2023 |
22 | EPCIC PROJECT FOR STARIUM NIGERIA LIMITED | Project management, fabrication, engineering, electrical, plumbing, construction & installation, inspection & tests, pre-commissioning & commissioning for a detergent factory. | Starium Nigeria Limited | 2022 – 2023 |
23 | EPCIC OF STORAGE TANKS FOR A.A. RANO LUBRICANT OIL BLENDING PLANT (LOBP) | Management, fabrication, procurement, storage-tank construction & installation, inspection & tests, pre-commissioning & commissioning works. | A.A. Rano Nigeria Limited | 2022 – 2023 |
24 | EPCIC OF STORAGE TANKS CIVIL WORKS FOR A.A. RANO LUBRICANT OIL BLENDING PLANT (LOBP) | Foundations & civil works for storage tanks; inspection & tests; pre-commissioning & commissioning works. | A.A. Rano Nigeria Limited | 2022 |
25 | EPC OF PROCESS PIPING NETWORK FOR MAMUDA GROUP SOAP FACTORY | Engineering design, procurement & construction of piping network within soap factory: fabrication of pipes, racks & supports. | Mamuda Group | 2022 – 2023 |
26 | EPC GLASSFORCE FACTORY PROJECT | Buffer tank & materials supply; fabrication & installation of tanks; LNG regasification; fire hydrant piping; temporary gas & water piping; painting; ductwork; filter installation. | Consol Glass (Glassforce) | 2021 – 2022 |
27 | EPC MAMUDA FACTORY PROJECT | Water treatment piping; soap-tank steam piping; fabrication & installation of boiler & biscuit air piping. | Mamuda Group | 2021 – 2022 |
28 | EPC OF PIPING NETWORK FOR MAMUDA GROUP IPS 3 | Engineering design, procurement & construction of piping networks to IPS 3 machines: fabrication of pipes, supports & insulation. | Mamuda Group | 2022 |
29 | EPC OF DUCTS FOR BUA CEMENT PRODUCTION PLANT LINE 4 JUNE | Engineering, procurement, construction & installation of ducts for BUA Sokoto cement plant line 4. | BUA Cement/CBMI Sinoma | 2022 |
30 | CONSTRUCTION OF BUA CEMENT LIMESTONE STORAGE LINE | Fabrication, installation & construction of civil facilities for limestone transport & storage: levelling, excavations, formwork, reinforcement, casting & curing. | BUA Cement/CBMI Sinoma | 2022 |
31 | MAMUDA GROUP LNG RE-GASIFICATION PROJECT, GREENVILLE PLANT, KANO STATE, NIGERIA | Fabrication & installation of DN 6–DN 150 SS/CS pipelines with connections to offloading skids, PBU skids, booster pump, vaporizers & PRMS. | Greenville Oil & Gas Co Ltd/Mamuda Group | 2022 |
32 | NB CERAMICS LNG RE-GASIFICATION PROJECT, GREENVILLE PLANT, KANO STATE, NIGERIA | Fabrication & installation of DN 6–DN 150 SS/CS pipelines with connections to offloading skids, PBU skids, booster pump, vaporizers & PRMS skids. | Greenville Oil & Gas Co Ltd/NB Ceramics | 2022 |
33 | BUA LNG RE-GASIFICATION PROJECT, GREENVILLE PLANT, SOKOTO, NIGERIA | Fabrication & installation of DN 6–DN 350 SS/CS pipelines to 12 LNG tanks, offloading skids, PBU skids, booster pumps, vaporizers & PRMS. | Greenville Oil & Gas Co Ltd/BUA Cement Plc | 2021 |
34 | 4” × 0.15 KM GAS SUPPLY TO BUA CEMENT PLANT-AGGREKO GAS GENERATOR, KALAMBAINA, SOKOTO STATE, NIGERIA | Design, procurement & installation of 4” × 0.15 km piping, tie-in from PRMS skid; installation, testing & joint coating. | BUA Cement Plc | 2021 |
35 | 14” × 1.1 KM, 12” × 1 KM, 10” × 0.2 KM & 6” × 0.2 KM GAS SUPPLY TO BUA CEMENT PLC—KALAMBAINA PROJECT, SOKOTO STATE, NIGERIA | Design & construction of PRMS skids for multiple units & piping network: stringing, welding, painting, testing & coating. | BUA Cement Plc | 2021 |
36 | NIGERIAN BREWERIES LNG RE-GASIFICATION PROJECT, GREENVILLE PLANT, KADUNA STATE, NIGERIA | Fabrication & installation of DN 6–DN 150 SS/CS pipelines with connections to offloading skids, PBU skids, booster pump, vaporizers & PRMS. | Greenville Oil & Gas Co Ltd/Nigerian Breweries, Kaduna | 2020 |
37 | 6” × 1.5 KM GAS SUPPLY TO BUA CEMENT PLANT-AGGREKO GAS GENERATORS PHASE 2 | Procurement & installation of 6” × 1.5 km piping, tie-in from PRMS skid; stringing, welding, painting, testing & coating. | BUA Cement Plc | 2020 |
38 | 8” × 1.5 KM & 4” × 0.8 KM GAS SUPPLY TO BUA CEMENT PLANT-AGGREKO GAS GENERATOR PHASE 1 | Procurement & installation of piping networks; design, fabrication, stringing, welding, painting, testing & coating. | BUA Cement Plc | 2020 |
39 | 8” × 1.5 KM GAS SUPPLY TO MAMUDA INDUSTRIES FACILITIES | Engineering design, procurement & construction of an 8” × 1.5 km gas piping network from LNG tanks to regasification plant & equipment. | Mamuda Group, Kano | 2020 |
40 | EPC OF PROCESS PIPING NETWORK FOR MAMUDA FOODS FACTORY | Design, procurement & construction of 4″ & 6″ × 1.5 km piping within the factory including fabrication of pipes, racks & supports. | Mamuda Group, Kano | 2019 – 2020 |
41 | EPC OF PROCESS PIPING NETWORK FOR ASPIRA NIGERIA LIMITED SOAP & DETERGENT FACTORIES | Design, procurement & construction of all piping networks within factories including pipes, racks & supports fabrication. | Aspira Nigeria Limited, Kano | 2019 – 2020 |
42 | 6” × 2 KM GAS SUPPLY TO ASPIRA NIGERIA FACILITIES | Design, procurement & construction of 6″ × 2 km gas piping network from LNG tanks to regasification plant & equipment. | Aspira Nigeria Limited, Kano | 2019 – 2020 |
43 | 10” × 1.8 KM & 12” × 1.2 KM GAS SUPPLY TO BUA CEMENT PLANT-OBU 2 PROJECT, OKPELLA, EDO STATE | Procurement & installation of PRMS skids & piping network; design, stringing, welding, painting, testing & coating. | BUA Cement Company Limited | 2018 |
44 | SECTIONAL REPAIR/REPLACEMENT OF DAMAGED GAS PIPELINE WITHIN BUA CEMENT PLANT, OBU, OKPELLA, EDO STATE | Engineering, construction & replacement of a damaged 3″ pipeline: nitrogen purging, cutting, welding, cleaning, NDT, coating, pressure testing & installation. | BUA International Limited | 2018 |
45 | LPG SUPPLY TO TECSERVE GAS LIMITED, OSOGBO, OSUN STATE | Engineering, procurement & construction of LPG receiving station: detailed design, fabrication, painting, installation, testing & coating. | TECSERVE Gas Limited | 2018 |
46 | 8” × 1.5 KM & 6” × 1.2 KM GAS SUPPLY TO BUA CEMENT PLANT-OBU 1 PROJECT, OKPELLA, EDO STATE | FEED & detailed design for 8″ × 1.5 km & 6″ × 1.2 km piping network; fabrication, stringing, welding, painting, installation, testing & coating. | BUA Cement Plc | 2014 – 2015 |
47 | 16” × 29 KM GAS SUPPLY SYSTEM TO BUA CEMENT PLANT, OBU, OKPELLA, EDO STATE | Engineering, procurement & construction of PRMS Station & 29 km pipeline: detailed design, stringing, welding, painting, testing, coating & hot-tapping. | BUA International Ltd./NGC/SATCO | 2012 – 2015 |
48 | CNG SUPPLY SYSTEM TO REDEEMED CHRISTIAN CHURCH OF GOD (RCCG CAMP) | Construction of civil & mechanical facilities for CNG receiving station; engineering, procurement & construction of six-CNG terminals with 6 transfer posts. | The Redeemed Christian Church of God, Redemption Camp, Lagos-Ibadan Expressway, Ogun State | 2012 |
49 | GAS SUPPLY SYSTEM TO TOWER ALUMINIUM | Engineering, procurement & construction of entire pipeline/piping network including PRMS tie-in: design, stringing, welding, painting, installation, testing & coating. | Bolivia Energy Technology Ltd, Ikeja, Lagos/Tower Aluminium | 2010 |
50 | FABRICATION OF DISPLAY RACKS AND RE-BRANDING OF SERVICE STATIONS | Construction & fabrication of display racks and reconstruction of service stations: mechanical, civil & painting works. | MRS Oil Nigeria Plc | 2009 |
51 | CNG SUPPLY SYSTEM TO MIDLAND | Construction of civil & mechanical facilities for five-CNG downloading terminals with 5 transfer posts. | Midland Galvanizing Ltd, Abeokuta, Ogun State | 2008 |
52 | ENGINEERING, PROCUREMENT & CONSTRUCTION OF HELIPAD FOR ABEOKUTA CITY GAS STATION | Engineering, procurement & construction of helipad: detailed drawings, road & water-borehole works, plus maintenance instructions. | Zakhem Construction Nigeria Ltd/NGC | 2007 |
53 | 6” × 8.5 KM GAS SUPPLY SYSTEM TO GUINNESS BREWERY PLC, BENIN | Engineering, procurement & construction of civil & pipeline network including PRMS tie-in: design, stringing, welding, painting, testing, joint coating & thrust boring. | BOAB Nigeria Ltd, Ilupeju, Lagos/NGC | 2008 |
54 | GAS SUPPLY SYSTEM TO ABEOKUTA CITY GATE | Project management & consultancy for civil & pipeline works including process facilities installation & PRMS tie-in; supervision of pipeline network. | International Energy Services Ltd/NGC | 2007 |